Monthly Archives: September 2013

Sketch of stress and strain in a Bigelow module orbital ring

Sketch

Image | Posted on by | Leave a comment

ocf 4

Fourth iteration of the construction facility, with the GEN0.5 Enterprise being built This is a pure sketchup model.

Image | Posted on by | Leave a comment

The orbital construction facilty

Partially build Orbital Construction Facility Sketchup only.

Image | Posted on by | Leave a comment

MH five stacked rocket

For MH, a super simple SSTO, everything goes up to space!

Image | Posted on by | Leave a comment

Orbital construction facility

A Space X Dragon coming in to dock at the expanded ISS. The centrifuges for crew health, Bigelow modules for work and living space, additional solar panels and radiators.

Image | Posted on by | Tagged | Leave a comment

The same but from the bottom

The Skylon is not very visible in black on Black! Better here.

Image | Posted on by | 2 Comments

Busy Orbital Construction Facility

A SSTO, a second before it turn off it’s engines, coming up to a busy OCF

Image | Posted on by | Tagged | Leave a comment